Data centres used about 415 TWh of electricity in 2024, around 1.5% of the world total, according to the IEA’s Energy and AI report. Its 2026 update estimates 485 TWh in 2025 and roughly 950 TWh by 2030. AI is the fastest-growing part. The totals are reasonably known; the per-task cost of AI is not, so organizations should measure their own.
How much electricity do data centres and AI use?
The International Energy Agency (IEA) is the most cited global source. Its figures cover all data centres, of which AI is a growing share.
| Indicator | Figure | Source |
|---|---|---|
| Data centre electricity use, 2024 | About 415 TWh (around 1.5% of global electricity) | IEA, 2025 |
| Share of 2024 consumption: United States / China | About 45% / about 25% | IEA, 2025 |
| Data centre electricity use, 2025 | About 485 TWh (up 17%) | IEA, 2026 |
| Growth of AI-focused data centre consumption, 2025 | About 50% | IEA, 2026 |
| Projected data centre use, 2030 | About 950 TWh (around 3% of global electricity) | IEA, 2026 |
| United States data centres, share of national electricity, 2023 | 4.4% (176 TWh) | US DOE and Berkeley Lab, 2024 |
| United States data centres, projected share, 2028 | 6.7% to 12% | US DOE and Berkeley Lab, 2024 |
The IEA’s April 2026 update says data centre demand grew 17% in 2025, while global electricity demand grew about 3%. It expects consumption by AI-focused data centres to triple by 2030. In the IEA’s 2025 report, the United States and China together accounted for nearly 80% of projected growth to 2030.
National figures can be larger than the global share suggests. The US Department of Energy reported that data centres used 4.4% of US electricity in 2023, based on a Berkeley Lab study. It projected 6.7% to 12% by 2028.
Where is the pressure showing up?
The pressure is local before it is global. Data centres cluster in a few grids, so their share there is far above 1.5%.
PJM runs the grid market in much of the eastern United States. Its 2028/29 capacity auction cleared at the price cap in every zone, as we covered in PJM’s capacity auction. The market monitor attributed about $6.3 billion of roughly $16.4 billion in costs to data centres. Buyers are responding with long contracts: Google’s deal with Constellation covers 3,590 MW of nuclear supply in the same market.
For an organization using AI, this matters in two ways. Electricity costs flow into cloud prices over time. And where compute runs determines both its cost and its emissions.
What is still uncertain?
Three things are unclear, and any figure should be read with them in mind.
The forecast range is wide
The IEA’s 2025 report gives a central case of about 1,200 TWh by 2035. Its scenarios run from about 700 TWh, if bottlenecks slow adoption, to more than 1,700 TWh, if AI uptake accelerates. Chip supply, grid connections and efficiency gains all move the result.
Per-task energy depends on what is counted
In August 2025, Google reported figures for a median Gemini Apps text prompt. It used 0.24 Wh of energy, 0.03 grams of CO2 equivalent and 0.26 mL of water. Counting only active chips gives 0.10 Wh. Google called that narrower method an underestimate of the real footprint. It also noted that its figures were not verified by an independent third party.
The same company reported a 33-fold drop in energy per median prompt over twelve months. That shows how quickly efficiency can change, and why last year’s estimates age fast. A median text prompt is also not a long reasoning task, an agent run or video generation.
Facility efficiency has stalled
Power usage effectiveness (PUE) measures how much facility energy goes beyond the IT equipment itself. The Uptime Institute’s 2025 survey found little change in average PUE for the sixth consecutive year. Gains now depend more on chips, software and utilisation than on buildings.
What should an organization using AI measure?
Most companies do not own data centres. They buy AI through cloud platforms and model providers. They can still measure and ask for the numbers that drive energy use.
- Energy per completed task. Measure per business outcome, such as a document processed or a case resolved, not per prompt. One task may call a model many times.
- Model fit. Record which model handles each task. A smaller model that meets the quality bar uses less energy than a large one used by default.
- Utilisation. For dedicated capacity, track how much of the time the accelerators do useful work. Idle reserved hardware still draws power and still costs money.
- Location and time. Note the region and grid where workloads run. Carbon intensity varies by grid and by hour, so batch jobs can move to cleaner windows.
- Water. Ask providers for water usage effectiveness by region, especially for sites in water-stressed areas.
- Facility overhead. Ask for PUE of the sites you use, and check whether reported figures are measured or estimated.
- Method disclosure. For every figure a vendor gives, ask what it includes: active chips only, idle capacity, cooling, networking.
- A budget per task. Set an energy and cost ceiling for each AI workflow, and review it when models or volumes change.
These measures also support cost control. The drivers of energy use, such as model size, repeated calls and idle capacity, are the same drivers of the AI bill. We explored that link in keeping AI costs under control.
This article is general analysis, not regulatory or financial advice.
How we see it at Blackwood
Blackwood Stone Holdings is an applied research and development company specialized in artificial intelligence and advanced engineering, founded in 2009. In our view, the energy question is a design question. The cheapest kilowatt-hour is the one a well-designed workflow never asks for.
We work on both sides of this link. On one side, we design applied AI that calls a model only when a task needs it, and records what each call cost. On the other, we follow how grids and generators adapt to new loads in energy. An organization that can state its energy per task will negotiate better contracts and make cleaner choices than one that only reads global totals.